A recent case study in the Journal of Composites for Construction outlines the process of inspections and assessments to identify key areas of concern, and steps taken to repair and strengthen the bridge.
The RiverRenew project in Alexandria, Virginia, includes a 2 mi long tunnel, multiple deep shafts, two large pumping stations, and the significant expansion of an interceptor sewer.